Answer Posted / jyoti ranjan
Working drawing is a drawing from which a lay man can find all details and execute the work smoothly.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is mc arther pile?
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
What is difference between combin footing & rapt footing
What are moment of inertia and its importance in civil engineering?
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
What is a tensile strength? What is the tensile strength of wood?
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
Mention what are the composition of a landfill?
Does VDF add strength to the flooring apart from preventing water ingress?
What is Rankine Cycle?
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
How do you change a dimension value in solidsworks?
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high