If a 1.5V,3W torch light bulb is connected in series with a
15HP/11.19KW,230V single phase motor and the combination is
connected against a 230V supply and switched on than what
will happen keeping all other parameters as it should be
A)the bulb will glow normally B)the bulb will not glow C)the
bulb will glow with extra brightness D)the bulb will burn
out and if a fuse is connected to the above circuit will
something happen to the fuse and what about the single phase
motor will it be affected?
Please explain with derivation

Answer Posted / s.s.kothavale.

Normaly bulb will draw 2amp current. So you may use it as
2amp fuse in circuit. 15 hp motor will draw huge current
while starting, hence bulb will get fused instantly.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the use of iron core in a transformer?

729


When can we take Neutral as common neutral link?

1314


WHY IN AC DRIVES,INPUT PHASE CURRENT SHOW UNBALANCE?

1818


what is the use of expulsition protective gap in 11Kv line.

1793


how to find the Motor,s insulation Power?

1327






How many types of circuit loads are there in a common electrical circuit?

779


What is the approximate value of stacking factor?

800


How to design pavement quality concrete by using C.R.C.P Method

1396


I want to put this query to SENIOR & EXPERIENCED ELECTRICAL ENGINEERS. 1)I want to know about the control circuit diagrams for control panels. I found it difficult to understand. Is there ant booklet through which we can learn the circuit diagrams? 2)I want to learn about conduiting, laying cables, preparing cable schedules and various techniques which is the part of building infrastucture(construction field). I don't have any experience in this area. I have experience in control panels only. that's why i am not getting any opening in building infrastucture (construction field).Can I get the job in this field as Trainee Engineer? How to enter this field? I need job in PUNE

1574


what is inverter and converter

1512


What is the effect of pi controller on the system performance?

715


At full load wat is the motor p.f And at no load will is the motor p.f?

1812


What is the meaning of floating point earthing in battery backed systems ?

1585


Dear sir, I completed DECE In the year 1995.Now i am working in a private company from last 10 years as an Electrical supervisor.The company having a 1000 KVA transformer.Now i try to apply "C" Licence. I am eligible or not.If not eligible,pls give solution.

1392


Explain dc generator with its types?

720