how many bricks are requir for one unit ho we will caculate
Answer Posted / col baldev singh
1 cum of brick work requires 500 bricks but adding 10
percent wastage actualy it requires 550 bricks
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
what else we can add rather than admixture in concrete to reduce the cement quantity?
how calculate the bearing from two coordinates?
What is the method of soil replacement test?
What is semirigid connections?
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
please briefly explain calculating or estimating steel quantity for a RCC column?
what is directivity effect?
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
What is command line?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
what is m30 in concrete tiles