Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how many bricks are requir for one unit ho we will caculate

Answer Posted / col baldev singh

1 cum of brick work requires 500 bricks but adding 10
percent wastage actualy it requires 550 bricks

Is This Answer Correct ?    4 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

All aptitude question of Bechtel

1840


Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?

2313


Which percentage of carpet area use in plot area of office building.

1954


3. What are the disadvantages of your present job, things you do not like about it?

2762


How much cement,sand,bricks and water needed for 1square metre brick work?

1761


Is it possible to make a feature using an overdefined sketch?

1337


what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.

2315


how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend

1985


Did any of the egyptian pyramids ever fall down?

1142


GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.

2453


What is the density of DLC & PQC and how it is differ from normal concrete?

3644


how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.

3723


what is the basic difference between Coloumn & Shear Wall

2133


I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.

2528


16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.

18204