How many number of reject links merge stage can have?
Answer Posted / vinod upputuri
Important feature of Merge stage is: it collects the
rejected data from reference links when compared to master link.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
Describe routines in datastage? Enlist various types of routines.
In work load management there are three options of Low priority, Medium priority and High Priority Jobs which can be used for resource management. why this feature is developed when there is already jobs prescheduled by scheduler or autosys. what will be the use of workload management then?
How can we improve the performance in datastage?
What are the different type of jobs in datastage?
What is the difference between odbc and drs stage?
How many areas for files does datastage have?
how to read 100 records at a time in source a) hw is it fr metadata Same and b) if metadata is nt same?
What is active and passive stage?
What are system variables and sequencers in datastage
Define project in datastage?
What is orabulk stage?
What is the roundrobin collector?
what is the use of surogate key in datastage
Name the different sorting methods in datastage.
what is the use of materialized view?