How can I zero check of wet leg type DP Tx ?
Answer Posted / yasir nazir
if the transmitter is installed below the tank,then we have
to calculate the HP side level below the tank zero level,and
applying
that much pressure on HP side to check the zero level.
And if transmitter is installed at zero tank level,then
isolating the HP side and draining the HP side gives the
zero level at transmitter.
Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
Why humidity limit is 30 to 55 % for raw material storage?
what is the working principal of pribe
Explain the mechanism behind the turbine meter.
Give Detail information about plc,dcs,and scada system?
how radio frequency level probes works with its controller ? what is its principle ? pls give me brief explanation?
pls give me presant awerness quistion and answer in my emailid.
how will you check torque value during Factory acceptance Test for control valve/ESD ON/OFF VALE how will you confirm this torque value is being correct, Which document will you be refer.
please tel me the calibration of pneumatic controler.
please any body have most important data for study for saudi aramco test of instrument QC thanks email shahnaveedullah@gmail.com
What is offset in a control system.
I am teja. I am studying Msc(tech) Electronics and Instrumentation (3years course) in Andhra university. But my course is not recognised by UGC and AICTE. Please tell me the job opportunities after this course. And i fineshed PLC course in IGIAT ,Vizag.Also complted my short term coure in SCADA, Seimans WinCC in ATI,Hyd.After Msc can i join Mtech for good job? or phd. How i can get good job in INdustrial Automation Side. Please give replay.Because this is my life matter.
Please send me the sample question of Instrumentation of hpcl/iocl exam. my mail id hihi_kiholo@rediffmail.com
What is Droop? What is Step/Gradient Limiter in Turbine Governor control?
ORP sensor working principle?
What is the use of double seated valve?