what is post close & pre close of trip circuit supervision
relay in circuit breaker control scheme?

Answer Posted / ashish patil

Preclose means breaker in off condition it supervise the trip coil & trip ckt is healthy.
& Postclose means It supervise When breaker is ON.

Is This Answer Correct ?    43 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate Voltage regulation of 22 KV Over head Line.

1192


what is breathing?

1339


Write the analogous electrical elements in force voltage analogy for the elements of mechanical translational system.

728


how the inner and outer body is separated in aircrafts?

593


What is ideal IR values for ground and neutral.

1297






What are the internal and external faults?

617


What is the abbreviation of NGT panel

1507


Type of motor stater detail and working detail

1265


The moisture in air will condense at

680


What are capacitive,resistive,inductive surge absorbation? What is ferranti surge absorber? What is lagrangian cost? What is Px operator?

1490


In how we connect watt meter for open & short circuit test of a single phase transformer.

5639


63MVA,220KV/6.9KV Transformer LV side neutral is connected to Earth pit through NGR. Whether this earth pit required to connect with near by below grouding earth mat or it is to be kept separate?

2296


what is the use of Auto re-closer?

1646


Graphs of measuring power and speed on dc motor

1457


I am inpecting a 10kVA UPS what tests should i do and should i observe?

1799