what is post close & pre close of trip circuit supervision
relay in circuit breaker control scheme?
Answer Posted / ashish patil
Preclose means breaker in off condition it supervise the trip coil & trip ckt is healthy.
& Postclose means It supervise When breaker is ON.
Is This Answer Correct ? | 43 Yes | 5 No |
Post New Answer View All Answers
How to calculate Voltage regulation of 22 KV Over head Line.
what is breathing?
Write the analogous electrical elements in force voltage analogy for the elements of mechanical translational system.
how the inner and outer body is separated in aircrafts?
What is ideal IR values for ground and neutral.
What are the internal and external faults?
What is the abbreviation of NGT panel
Type of motor stater detail and working detail
The moisture in air will condense at
What are capacitive,resistive,inductive surge absorbation? What is ferranti surge absorber? What is lagrangian cost? What is Px operator?
In how we connect watt meter for open & short circuit test of a single phase transformer.
63MVA,220KV/6.9KV Transformer LV side neutral is connected to Earth pit through NGR. Whether this earth pit required to connect with near by below grouding earth mat or it is to be kept separate?
what is the use of Auto re-closer?
Graphs of measuring power and speed on dc motor
I am inpecting a 10kVA UPS what tests should i do and should i observe?