High Voltage out door substation-annual maintenance, things
to be considered
Answer Posted / a.p.nanjappa
1) BOLT CONNECTION ALL EQUIMENTS CHECKING.
2) MAIN EARTH CONNECTION.
3) eARTH SHIELD, fiber optic cable connections.
4) Test the CB TIMING ,INSULATION, PROTECTION RELAYS,
ct,VT, - OIL TESTS, DS,ES,
5)hvac
6) DC system
7) Outdoor lighting/emergency change over.
8) On line sub stn cleaning eauipment
9) funtional test for Bus bar differenctial protection and
its logic sequence restoration of sub stn equipment. if any)
in case of one and half CB sub-station configuration.
10) fire fighting system.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is the relationship between phase & neutral
what is a pulse transformer? how rise time of pulse changes when ever the voltage changes?
If two Transformers are connected in parallel having impedance of 50KA in both transformers will the impedance increase or decrease after connecting transformers in parallel?
Write down the brushes of a de machine.
how do i commission a distribution transformer knowing all its ratings and transformation ratios?d
what will happen if i connect 12 volt battery with 24 volt battery charger.
What is Phase margin?
Explain the experiment on ward leonard method of a speed control on a dc shunt motor with an suitable circuit diagram.
what is the difference between megger and earth resister ??
main difference between ac and dc?
How may I enrol or get admission to your program?
What are operating procudures & Safety precautions to be observed while operating OLTC in manual mode ?
A 1F capacitor is charged to 100V initially. A 1H inductor is connected accros the capacitor througha a switch. The current in the circiut when the switch is closed is____
how to test power transformer.YNd11
Explain the operation of variable frequency transformer?