Answer Posted / mohanraj
BBS is to calculate wt of reft.,
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
How many square meter can mason layout chb per hour
Formula of mid span bar
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
2nd and 4rt angle elevation used in which country ?
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
whats is difference between anchorage length and development length
how to compute slab reinforcements on step by step procedures??
according to the painting co efficient, we should take the one side of doors (or) windows or both sides?
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
What is the Roll of Water Bonding under VDF road?
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
Why should pumping be not used in case of concreting works?