Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What happens when the power factor is leading and its
disadvantages.

Answer Posted / a.p.nanjappa

THIS IS CASE USEFUL FOR UTILITY GRID MANAGEMENT.
GENERALLY EACH POWER GENERATION EQUIPMENT IS MANUFACTURED
WITH say 162MW is designed to operate on 80MVAR 0.8PF
LEADING and 30MVAR 0.8-0.9PF lEADING. THIS IS THE PROPERTY
OF gENERATOR CHARACTERISTICS.
wHEN GENERATOR IS CONNECTED (SYNCHRONIZED), WITH GRID,
THEN ,GRID DETECTS THE lOAD. AS DEMAND INCREASES THE POWER
FACTOR CHANGES FOR LAGGING TO lEADING. THE MVAR EFFECT IS
MORE IN PEAK LOADS,BASE ,..
THE EFFECT OF POWER FACTOR ON GENERATOR IS THE ROOTOR GETS
HEATED DUE TO REACTION OF ELECTROMAGNETIC FLUX DEVELOPED
BETWEEN STATOR AND ROTORS FIELD.
the stability of the grid is to be increased by MVAR
compensator or capacitor banks according grid compensation.
as Utility is another organization ,they take advantages of
capacity of genarator.as a result , generator is subjected
overheating, if operated still, the generator is pulled out
of synchronism and trips.disadvantage is shoter life due to
rotor heating and expensive repair,prolonged unscheduled
outage,revenue loss.

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

hi this is hema, r there any books in particular for the preparation of the APPSC-A.E.E(electrical), if so please mail me the names ... thank u .

1968


How to connect the chemical earthing and complete process tell me plz

1915


i want to know that what is the eligibility critaria for ongc exam?

3078


I want to put this query to SENIOR & EXPERIENCED ELECTRICAL ENGINEERS. 1)I want to know about the control circuit diagrams for control panels. I found it difficult to understand. Is there ant booklet through which we can learn the circuit diagrams? 2)I want to learn about conduiting, laying cables, preparing cable schedules and various techniques which is the part of building infrastucture(construction field). I don't have any experience in this area. I have experience in control panels only. that's why i am not getting any opening in building infrastucture (construction field).Can I get the job in this field as Trainee Engineer? How to enter this field? I need job in PUNE

1987


3ph motor running with unequal kw and different pf what are the reasons

1962


What is the function of interposing current transformer?

1106


Classify drilling machines.

1207


what parameters should we check to reduce the power bill

2379


How would you relate your key competencies to this position?

2266


How to calculate the value of earth capacitance in a transmission line.

2410


what is the practical application of full adder circuit?

1898


What will be the impact on motor performance if a LT motor is rewound with changed motor winding data as given below:- Original winding data: total 04 wires = 02 wires of 17 SWG + 02 wires of 16.5 SWG. Changed Winding data: total 03 wires of 15.5 SWG wire size Motor rating: 160KW, 740RPM, 415V, ID FAN application. Normal Running Current = 95% of FL Current.

2123


Can anyone explain me about the RLC based Impulse high voltage generator and how to and operation of Series resonant High voltage reactor...?

1984


What is the difference between hot and cold loop testing?

1200


How Can You Relate Power Engineering With Electrical Engineering?

1291