how to replace 8mm bar with 10mm bar if the the 8mm bar is not available..???
Answer Posted / subhasis1991
You can think this in other way...
To use 10mm dia bars you just need to calculate spacing to be provided.....
When you are to use 8mm bar you would be provided the spacing(S1)..Now the spacing to be provided for a design is dependent on bar area(which is proportional to bar dia^2)...For greater bar area spacing would be less and vice versa ,so spacing is pretty much inversely proportional to the area of bar...Now to get 10mm bar spacing you just need to calculate :S1*(10^2/8^2) and you are done..
| Is This Answer Correct ? | 20 Yes | 10 No |
Post New Answer View All Answers
what is cement wastage percentage in NHAI ROAD WORKS
Formula for calculating the volume of bulb in underreamed pile
how do you calaculate the total steel quantity of an rcc building using thumb rule?
acceptance criteria for concrete works
What is dead load impact load live load
How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm
what course did you consider thinking before you enrolled in college?
what is the minimum compressive strength of clay brick
Explain what is structural frames or systems?
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
Explain soil analysis?
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
Give me an example of a time when something you tried to accomplish and failed.
what is the criteria for the finalisation of pavement thickness in road project?
What is meant by autocad?