A bill was raised by contractor which read as follows
1.) Excavation in normal soil upto 1.5m - 250 cum
2.) Excavation in normal soil 1.5m to 3m - 240 cum
3.) Excavation in soft rock - 350 cum
4.) Excavation in hard rock - 250 cum
5.) Filling with available soil - 825 cum
6.) Filling with bought out soil - 1100 cum
How can I verify the above quantities, especially for item
no. 5 & 6?
What checks are necessary before releasing the bill ?
Answer Posted / gkreddy
contractor should be ansure there must
and should maitain JMR( Joint
Measurement Record) for produce the bill
otherwise bill should be rejected.claint
also insist the contractor to maitain JMR.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is min thickness,min grade of conc & age of PQC ?
What is pre-stressed concrete?
Define What is an ice dam sock?
In the roof of a pumping station explain briefly the components of a waterproofing system?
How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
calculate the quantity of water for 1:6 cement mortar
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
whaat is blister in box girder bridge and what is its function..
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
Mention different types of roof systems?
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork