Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

A bill was raised by contractor which read as follows
1.) Excavation in normal soil upto 1.5m - 250 cum
2.) Excavation in normal soil 1.5m to 3m - 240 cum
3.) Excavation in soft rock - 350 cum
4.) Excavation in hard rock - 250 cum
5.) Filling with available soil - 825 cum
6.) Filling with bought out soil - 1100 cum

How can I verify the above quantities, especially for item
no. 5 & 6?
What checks are necessary before releasing the bill ?

Answer Posted / gkreddy

contractor should be ansure there must
and should maitain JMR( Joint
Measurement Record) for produce the bill
otherwise bill should be rejected.claint
also insist the contractor to maitain JMR.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the joints wants to made in masonry where door opening, arches like etc..

1787


What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?

2240


Which is the direction of negative angle?

1153


Why Vitrified tile are getting pop up.

1086


TELL ME THE EQUATION FOR OGEE SPILLWAY

2634


Why you are leaving present job?

2172


what is constat for brickwork

2204


how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?

1863


How is improve my knowledge in construction industries....

2180


If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.

2433


How to find CN by using arcgis 9.3?

2485


What is reinforced concrete?

1165


What is an ortho mode?

1288


What is the use of extruded feature in solidsworks?

1301


a butt weld is specified by

3087