calculation of cement bags in 1:2:4 concrete mix
Answer Posted / gopalakrishna
cement: 1*1.33/7=0.19*1440=273.6/50=5.47bags say 6
sand :2*1.33/7=0.38 cum ,jelly 20mm =4*1.33/7=0.76cum
| Is This Answer Correct ? | 8 Yes | 10 No |
Post New Answer View All Answers
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
What is the zero value in quantity surveying
why are you joining in this (applied post) job and your aim for this job
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
What is meant by Crystal Concrete?
plz.show development and anchorage length in simple diagram.
Process of pcc in wateredug
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
How do we test on design and style in a software?
how to find hardness of water?why it should be determined?
What is Gsb tollens ?
what is modular brick and it size
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
how to determine H- zone in a column? where it will occur?