calculation of cement bags in 1:2:4 concrete mix
Answer Posted / gopalakrishna
cement: 1*1.33/7=0.19*1440=273.6/50=5.47bags say 6
sand :2*1.33/7=0.38 cum ,jelly 20mm =4*1.33/7=0.76cum
| Is This Answer Correct ? | 8 Yes | 10 No |
Post New Answer View All Answers
how much repeitation for conventional and maivan formwork?
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
How do we test on design and style in a software?
States some of the commonly used commands in cad software’s?
Define angular dimension?
what pressure the NP2 class RCC pipe can sustain?
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
cement and sand required for one block of size 0.23*0.15*0.46
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
What is kn measurement?
how to calculate total cost for slab 35'×8'
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
In block work seawalls what is the purpose of slip joints?
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
How long does it take concrete to harden?