In two way slab where should we stop the work at end of the day?
Answer Posted / ajay kulkarni
at L/3 from either end
| Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
i need gate exam civil engineering question papers with answers
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
How can we demolish concrete beams?
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
What is thumb rule in quantity and cost estimation of a residential building?
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
explain fie benefits of using standard terminology in the measurement process
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
What is the worlds largest concrete dam?