proportions of m10, m15, m20, m25, m30, m40, m45, m50, m60,
m70, m75, m80 etc
Answer Posted / bhavin maniyar
m10= 1:4:8
m20= 1:1.5:3
m25= 1:1:2
m30=?
m35=?
m40=?
| Is This Answer Correct ? | 35 Yes | 13 No |
Post New Answer View All Answers
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
what is directivity effect?
What Are The Steps Involved In The Concreting Process, Explain?
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
"Gates of the dams are generally designed of curved shape". Why?
what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
Civil engineering material testing Standard results
Where is the worlds longest elevator and how long is it?
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
how do you stabilize a waterlogged area in road construction
How much quantity of rod binding work by a rod binder per day
where i can get material costs on weekly basis
how to estimate material requirement for an area of house in square feet?