Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

bulkege of concrete for design mix concrete for grade m30

Answer Posted / sjtbehera

i do not understand your qustion.As much we know about
bulkage of sand, bulkage of aggregate, ok bulkage of
concrete may be happen due to entrapped air in concrete.

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2457


Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot

2251


how many litres of enamel paint required for 5000 sft of site?? 

1941


What is the difference between Fe 500, Fe 500 D and Fe 515.

4073


What is the yield of 100 litres of water and 10 kg of cement in grout mix?

2090


what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet

1601


what is the calculation of raw material for 0.35cum of m-15

1459


show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation

2164


For making a new road in a village having a school & hospital , tell the steps of construction systemically ?

1655


What is aggregate?

1137


What are the advantages of cad?

1107


Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem

2757


How is the leaning tower of pisa supported?

1076


sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.

2896


Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3

2105