Answer Posted / shahid hussain
Beside all above answers I would add following:
It helps Standard Cost Estimate to be maintained on a
selected BOM and Routing (Production Version), can be fixed
in Material Master Costing 1 Tab
It Helps Planning for MRP to maintain the quota arrangement
for procurement proposals which is important for supply
chain planning and execution
Also help to avoid change/delete your master data (BOM
Routing etc) by controlling it through production versions
validity depending on
Lot Size
Validity Date
Help to have production planning by means of using line loading
Also help for mix costing ratios on mix costing scenario
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Define mrp group
Explain how to create prt master records?
We want to report on several status combinations like each order that has the status ‘not deleted’ and ‘not technically completed’. What set up is required?
How requirements( pir, sales order, customer requirement) are reduced after they are produced?
what does SAP business workflow do?
Difference between byproduct and co-product.
What is process keys
What is MRP Area or How can I excluede one storage location stock from MRP?
What is Planning time Fence?
What is 'mps' (master production scheduling)?
What does the use of ms70 followed by mcec get you?
Both labor and machine categories exist. How would you calculate the process time?
Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?
Define mrp controller
Scheduling times can be defined in the material master record by?