Answer Posted / amiya ranjan
profile corrective course for foundation
Is This Answer Correct ? | 8 Yes | 8 No |
Post New Answer View All Answers
why demand factor less then 1 ?
What is the snap size in civil and how can we create it?
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
How to find out kg per Sft ?
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
what is right & short method of measurement of slab&beam
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
What is zoning permit?
115mm thickness brick work how to required mortar
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
what is c4x light weight cement blocks
what is the name of shuttering oil used in oman
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
Define What is Civil Engineering?