3. What is Impedance Voltage in Transformer?
Answer Posted / sanjay sharma
it is % of rated primary voltage which require to establish
sufficient flux to produce full load current in short
circuited secondary, it is used while load loss test on
transformer.
| Is This Answer Correct ? | 6 Yes | 6 No |
Post New Answer View All Answers
What is depreciation factor?
sir, 3phase induction motor takes different pf and different KW in three phase while running,explain reason
1.main parts of generator? what is used A-check,B-check,C- check? 2.what is FM200 system in data centers? 3.difference between pac,ahu?
why do you add the load short circuit impedance when considering short circuit amperage. It seems that you should only consider supply. If you need to consider loads and you don't know what loads are to be added , what would be a good sub-transient reactance rating for the loads?
why the difference arise between HT reading & LT reading (submeters fixed in complexes, apartments etc)if the power factos exceed from 0.9 to 1 can the ht meter reads fast?
Hello Guys !! i want to rrb section engineer electrical(signal) previous model papers? any body help me?
give single line diagram of D.G distribution form alternator to main L.T panel?
what is formula for zero phase sequence of nuetal earthing transformer of 6.6 kv
Explain Active power,reactive power,how its related to each other , & inductive ,capacitive.
The D.C. spark test is applicable to single conductor cable & assemblies of insulated single conductor cables without insulation shield,metallic sheath or metalic armor?
how to convert lv line to hv line and viseversa, any losses will occur during this process
I want to put this query to SENIOR & EXPERIENCED ELECTRICAL ENGINEERS. 1)I want to know about the control circuit diagrams for control panels. I found it difficult to understand. Is there ant booklet through which we can learn the circuit diagrams? 2)I want to learn about conduiting, laying cables, preparing cable schedules and various techniques which is the part of building infrastucture(construction field). I don't have any experience in this area. I have experience in control panels only. that's why i am not getting any opening in building infrastucture (construction field).Can I get the job in this field as Trainee Engineer? How to enter this field? I need job in PUNE
If a shunt Dynamo has induced emf 100V and 0.4 ohm resistance and battery of accumulator of open circuit emf 110V and 0.5 Ohm resistance are in parallel what is common terminal potential difference?
for opening electrical shop, tips needed.
how calculated Transformer losses.