how many cement bags in 1m^3 cement concrete in all grade
Answer Posted / krishnasinh p. raj
As per IS:456 6 bags per Cum
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
as per is code, what is the minimum content of opc and ppc cement for rcc structure
How to find CN by using arcgis 9.3?
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
Mention different types of roof systems?
What is zoning permit?
rate analysis hiring of generator 62.5 KVA
how many BSCs can i connect to the HUAWEI MSC
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
What is the exception critarea of cube?
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
what is civil enginnering & what you need of this course?