Answer Posted / saran
parameterset is new technique introduced in 8.0.1 and by using this we can set parameters to any job with in the project
there is no this concept in 7.5 version
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
In work load management there are three options of Low priority, Medium priority and High Priority Jobs which can be used for resource management. why this feature is developed when there is already jobs prescheduled by scheduler or autosys. what will be the use of workload management then?
How do you schedule or monitoring the job?
Is possible to create skid in dim,fact tables?
Define ds designer?
What is the use of datastage designer?
How can we perform the 2nd time extraction of client database without accepting the data which is already loaded in first time extraction?
What steps should be taken to improve Datastage jobs?
What is the difference between odbc and drs stage?
Which warehouse using in your datawarehouse
Differentiate between hash file and sequential file?
How do you run datastage job from the command line?
What is datastage?
EXPLAIN SCD
Describe the main features of datastage?
Notification Activity