Anyone-Pls list the steps in partner determination?also,
what does this error/info mean "pls process table entry
manually) while doing partner determination.pls.explain
ASAP.
Answer Posted / ayanabha roy
pre-requiset
1.create an A/C group(OBD2)
2.create d number range (XDN1)
3.Assign number range to A/C grp(OBAR)
CONFIGURATION
1.DEFINE PARTNER DETERMINATION PROCEDURE
2.ASSIGN PART. FUNCTION TO PARTNER DETERMINATION PROCEDURE
3.ASSIGN PARTNER DETERMINATION PROCEDURE TO A/C GRP
4.ASSIGN PARTNER FUNCTION TO A/C GRP
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Name at least five features that you can control for the item category?
Default distribution channel we have only one distribution channel in our company. Can we default it in the transaction field that needs distribution channel data? How can we configure that?
What is the difference between a sales activity and a sales document?
Differentiate between shipping point and loading point.
It will be really helpful if someone can provide an example / System behavior where (1) only AC is used, (2) only TOR is used, (3) both AC & TOR is used ( in schedule line category) thank you
What are some pricing routines and sd functional specs?
Explain about distribution channel?
What is the data used in shipment scheduling?
What are the main and sub modules in sap?
Explain what is the difference between rush order and cash sales?
In R/3 we can represent a company's structure by defining and assigning corporate structure elements. What is the purpose of doing that?
Some materials have been blocked for procurement and production. Even though deletion flag is set for a material/plant level, the order can be still entered ( with a warning message). Is there a way to block such transactions for a material flagged for deletion?
Does sap transportation management have load planning capabilities? : transportation management
What is a sales deal and how to configure it?
What are the common transport errors in sap ? : transportation management