1.what is the main responsibilites of Site Engineer ? and
what are main attitude ?
Answer Posted / k sivaprakasam
reading to latest drawinng and given BOQ, PLANNING AND
CALCULATING MATERIAL REQUIREMENT AND MAINLY WELL LABOUR
MANAGEMENT. TASK IN RIGHT WORK IN FIRST TIME (IT WILL BE DO
NOT REWORK)
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
How to calculate construction cost of residential building in mumbai
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
What is geopolymer based concrete?
can you give me the details of rate analysis of steel and concrete?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What is 1/8 on the architect ruler denotes?
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
how to prepare site mix design
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
yasser arfatcompleted his degree in civil from which university
what is called the inverd level of mabhole chamber?
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)