how many nos of National highway in India.
Answer Posted / subrat
235
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
What are the advantages of cad software?
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
What is fineness modulus ? and its sieve # ?
What is bmc stands for in bmc software?
Which percentage of carpet area use in plot area of office building.
Rate analysis of Vitrified tile in cement mortor 1:3
How much cement will require for 1Rmt Skirting laying
For a washout valve why are two gate valves required in normal practice?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
Calculation of curtain wall of box culvert
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
The definition of national highway
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
how to calculate number of bitumen for road asphalt