%Z is something related to transformer winding.
it will deside the fault level of the transformer.

if u give (132*8.35/100)volts instead of 132V to you
transformer,
short circuit current = full load current.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is cause of static electricity? I experience shock when i touch metal equipment in a room ,furher check shows earth leakage showing 80ma at the DB near to the 400 MCCB?

1460


oltc of a transformer, how it works? and what are the equipment consist of describe briefly?

1572


What is phase cross over frequency?

636


Define steady state error.

650


A 100 kVA , 400 v/250 kv testing transformer has 8% leakage reactance and resistance on 100 KVA base . A cable has to be tested at 500 kv using the above transformer as a resonant transformer at 50 hz . if the charging current of the cable at 500 kv is 0.4 A find the series inductance required . Assume 2% resistance for the inductor to be used and the connecting leads . Neglect dielectric loss of hte cable . what will be the input voltage to the transformer ?

4490






what is saturation kit?which use above 15 kw motors panel side.

3581


Define reserve-generating capacity?

660


what is subtransient , transient and steady stateac components

1722


In power transmission using open belts or horizontal shafts it is preferable to have the slack side of the belt on the top because

777


How would you calculate power loss in a resistor?

637


What is the maximum operating temperature for a thermoplastic insulated cable?

659


Why you want to join non technical field when you are an engineer?

6209


What is block diagram?

655


Why do we need a separate control desk & PLC control panel in Boiler plant or coal handling plant? Can we provide cost effective Control desk cum PLC panel. Is there is an specific need for control desk.. kindly advice.

1872


Difference between rating factor of cable and derating factor of cable?

1189