In Normal sales process the system allows us to create only
one billing doc for a delivery. Why and how the system
allows to create 2 billing document for a delivery in
Intercompany sales IV and F2?
Answer Posted / sachin
Hi Sumanta,
Thanks for answering this question.I agree with you but i
wanted to know how does system allow us to create IV and F2
both for a single delivery document. I want to know the
technical control which allows us to create 2 billing docs.
Do you think any such controlling point is there ?
Thanks in advance.
Sachin
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
I have created value contract with order type WK1 in VA41. The target value is 500 USD and the net price is 1000 USD. There was no pop up message or error thrown while saving the contract when the net price exceeded the target value. And the system allowed to save the contract. Is there any configuration available to activate the warning or error message or any enhancement need to be done?
what is consignment stock process?
How to have one pricing at sales order level and different pricing at invoice level? what are the configuration to be done for this?
What is the difference between a sales activity and a sales document?
Can anyone tell me please how is the availability check carried out, how is availability working out in your job business, how is the ATP (availability to promise) is configured?
Can any body can give me the example for business scenarios in industry specific solution you work with for sap sd interview bez I just finished the training.
what is solution database and how to intigrate the service order with solution database? what is purpose of t.code IS31? wht is the service manager? waiting for feedback
What is availability check?
What table do I use in creating abap program that would output the sales based on sales organization of customers?
Mention what are the two places where you need to configure cin (country version india)?
how to attach pdf in output determination .
I have a scenario where the our unit of measure is Pc. The conversion is 1pc = 2.9768 m2. Now the client is saying that he will give the prices in Cubic meter. The current requiment is we have to derive a conversion ratio between pc (m2) and cbm. Please advice.
Can you assign two different sales organization to the same company code?
How have you used MASS tool in your last project, and to upgrade what data?
How can I transfer the payment method from customer master to sales order automatically?