If on an item a shop gives 25% discount, they earn 25%
profit. If they now give 10% discount then what is the
profit percentage.
Answer Posted / lalitha
marked price-discount= selling price-profit=cost price
selling price= (100+ profit%) of cp
also,selling price= (100-discount%) of marked price
75% of mp= 125% of cp
9o% of mp= ?% of cp
?%= (90 x 125)/75
= 150%
so sp=150% of cp.
therefore, profit =50%
| Is This Answer Correct ? | 10 Yes | 1 No |
Post New Answer View All Answers
A person has Rs 100/- in his pocket, he can as 25 pencils or 15books. He kept 15% of the money for travelling expenses and purchased 5 ncils.So how many books he can purchase with the remaining money.
The sum of the two numbers is 45 & difference of 2 numbers is 675. Find the number ?
If we r terminated at the middle of the program execution in UNIX,wat will happen to the program,it will continue running r terminate r the o/p will be send to ur mail?
f(X)=4f(X-1) THEN VALUE OF X=
A person is 80 years old in 490 and only 70 years old in 500 in which year is he born?
there is a matrix N x N .Its elements consist of either value =1 or value=0. If there is a any zero in the row, then the output matrix should have all zeroes in that row. If there is a single zero in any column then that column should have all zeroes n the output matrix. write the function to perform these operations. i want a solution in c/c++ language
Ajay can build a house in 16 days and Barry can do the same job in 12 days. With help of Chintu, they did the job in 4 days only. How many days Chintu can do the job?
What is the distance travelled by a ball that falls from a height of 8 mts and each time it bounces half the distance back?
A, B, C made trips to PIZZA centre B made 2.4 times more trips then ! , C made 6 more then A Total Min trips are
Find the next letter in the series A,C,F,J,0--
A can do a work in 8 days, B can do a work in 7 days, C can do a work in 6 days. A works on the first day, B works on the second day and C on the third day rely. that is they work on alternate days. When will they finish the work.(which day will they finish the work) (7+7/168)
Two trains are travelline at equilateral .Train A is travelling in the direction of earths spin.Other train B is travelling in opposite direction of earths spin.Which trains wheels will wear first?and why?
There are two balls touching each other circumferencically. The radius of the big ball is 4 times the diameter of the small ball.The outer small ball rotates in anticlockwise direction circumferencically over the bigger one at the rate of 16 rev/sec. The bigger wheel also rotates anticlockwise at Nrev/sec. what is 'N' for the horizontal line from the centre of small wheel always is horizontal.
the program requires 4000(n)1/2 [ie square root of n].if size of program was increased by 1% then calculate the percentage change in size of program.
Pipe A can fill a tank in 30 mins and Pipe B can fill it in 28 mins.If 3/4th of the tank is filled by Pipe B alone and both are opened, how much time is required by both the pipes to fill the tank completely ?