Answer Posted / mdzaki uddin
1.6/5.5=.29*1440+417.6/50=8.35 bags of cement (1.6 is factor,5.5is ratio example m20 1+1.5+3=5.5,1440 =cement volume
sand=o.29*1.5=0.435 cum then 0.435*35.32=15.36 cuft,
course aggegate=0.29*3=0.87cum then 0.87*35.32=30.72cuft
my mobile no:9885815803 call any time royal civil
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
How to calculate Volume of Wet cement concrete for a specific grade?
How much quantity of rod binding work by a rod binder per day
Describe a time when you anticipated potential problems and developed Preventive measures
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
what is the specific gravity of rubble in plum concert
what is Short bored pile foundation.
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?
why we use 19x9x9and 20x10x10 but not other
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
1:4:8 pcc calculation 591 cu.ft
what could be the production cost of 1 cum of concrete by CP30 plant
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
how pumping of concrete effects the quantity of material used in it?
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??