Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

1 tr is equal to how many Kw .is there any specific formula
for this to get the result .

Answer Posted / kumar

one ton refrigeration ton(TR)was defined as the heat
absorved by the one ton of ice (2000 pounds) causing it to
melt completely by the end of one day ( 24 hours).

1 RT= 2000 POUNDSX 144 BTU per pound / 24 hours
= 12000 BTU'S per hour
= 200 BTU/min
= 3.517 kj/s
= 3.517 kw
= 3516 watts
= 4.72 HP
so, TR= 3.517 KW

Is This Answer Correct ?    44 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the roles and responsibilities of electrical engineer in cement plant

2034


What is nyquist contour?

1180


what is method for testing CT

2149


i have been tasked with a design of protection, metering and control(PMC) relay panel extension to accommodate all PMC relays.There is an already existing panel where this one will be built.What are the design aspects for this kind of project? thank you.

2121


What are n circles?

1094


1.why should we connect the measuring instruments in l.v side in short circuit test of a transformer? 2.why the power factor is less in open circuit test of a transformer?

2074


I NEED RRB APTITUDE QUESTIONS AND MODEL PAPER,PLEASE SEND MY E-MAIL joo28_eee@yahoo.co.in

1925


What is the difference between acs 550 & acs 850

5807


Hi I'm doing my MBA(3rd semester).I applied for the post of ET conducted by BHEL the last year.I cleared the written and lost in personal interview.Again I wrote the exam this time and cleared the written n yet to take the personal interview.Shall I disclose in the interview about my studies.What shall i say if they ask about my change from studies to job

2160


how many load we can take for lighting

2284


Ceiling Fan and Storage type water heater. Discuss

1966


what are the differant std sizes of cable trenches?

2057


to vary valtage from 0 - max a variac is necessary . so how to design for high power applications nearly about 200KW power

2067


How do we calculate the Out put voltage of generator, after the excitation is being given?

1933


Why reactive power is needed in a power system? How is it being absorbed or delivered by alternators? For reactive power control we are changing excitation but reactive power absorbing or delivering related to stator. How these two are interlinked? i want a detailed explanation with necessary expressions and figures?

1914