What is the amount on nails per bag needed for 1m square of
wooden form work?

Answer Posted / m srinivasarao

approximately 150 gms/smt

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate the force on a column of three story building. What should be the base concrete height?.

1655


how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.

1506


What is a tensile strength? What is the tensile strength of wood?

676


step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed

1918


please briefly explain calculating or estimating steel quantity for a RCC column?

1446






what is features of a typ-ical modern air-conditioning installation?

1507


What is an ice dam sock?

714


how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you

1510


why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?

10226


how to find hardness of water?why it should be determined?

1587


how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???

1472


For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?

1491


which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?

1576


What is horizon or horizontal mining?

643


What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m

1749