How vendor is determined in third party sale scenario at
purchase order step???
Answer Posted / vijay dahiwal
we mentain source list using T code ME01 from where the vendor is determined
Pl add some more input if anyone can
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How many clients we will create in land scape (like in development server, quality server, production server )
What are the responsibilities of a functional consultant in an implementation project?
which screen support consultant uses in support project?
Explain the interfaces you have worked on?
What is difference between delivery document & scheduling?
What is the client-specific data?
accounting document is not getting generated for sto process. where is the control for this ? Thanks in advance
What is condition types?
What are the purposes of the number range objects J_1IEXCLOC and J_1IEXCINV? In which conditions 1. either of the two, or 2. both the objects should be used?
We can define our own exchange rate types and use them instead of the defaulted types, ‘m’, ‘b’ and ‘g’. How can we overwrite default types in sd?
What is the difference between transaction data and master data?
How shipping point is determined?
List a menu path to access stock requirements lists?
Describe the process flow for a credit memo.
Do you know what is made to order scenario or make-to-stock scenario? SO, in the make-to-order scenario, what’s the integration touchpoint that you figure MRP? My question is when you have a make-to-order scenario, how does MRP will be figured? How system know that when you create a sale order whether the sale order is calling for make to order or make to the stock type of order, which data determined this is made to order make to stock…. The system should understand when I create an order, whether it’s made to order or make to stock, so which parameter which value that system will be determined based on that system will say okay this make to order so I need to I mean the system has to go to the next level then it’s going to the MRP all the subsequent planning will be taken taking place, what’s the parameter that we have to check?