Answer Posted / saikiran.ch
Project planing is a part of project management,which relatess to the use of schedules such as Gantt charts to plan and subsequently report progress within the project management.
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
What is change order request?
Define What are the uses of alloys in daily life and how are alloys made?
How to calculate laplength for 3 floors
What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
What is the sugested procedure of water purification for public supply?
How do we calculate absolute pressure?
Describe the various methods of concrete curing?
What is meant by cartesian coordinate system?
how much cost of single coat 20mm thick plastering per sqre meter
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
What is the basic difference between OPC