What is the cost of Brickwall ( 4")(1:4) thick wall total
Area 245 sqft with plaster(1:6). With all materials
including.

Answer Posted / fredy

what is the cost of brick,sand,cement and mason coolie

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.

7582


Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.

1912


what is the minimum cement content for M20 & M25 as per is code -456(2000).

2715


How to calculate woden area in sft and Cft

1107


does a b.tech civil engineer fresher supposed to know how to design rcc structure?

3015






a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement

1668


Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet

2355


how much used soil in 1 brick of standard size?

1583


01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.

5069


how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.

2247


What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.

2145


mean of NH4 pipe

2121


1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM

2658


What is the general specifications of a bituminous pavement road?

1242


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

1680