curing of concrete why 7day's,14day's 21day's 28days
Answer Posted / ramesh t.s
according to the hydration process in concrete the strength will be vary.if water content reduced in concrete, there hydration process will be slow. tats why the concrete is curing at 7 days interval.
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
How to find out slope footing concrete
How many cement sand ballast in cc 1:4:8 40mm
Explain the mechanism of cavitations in pipes and drains?
what is total volume of ingredients used in concrete accordingly
How can i do RCC rate analysis?
Why does the pressure increase under soil?
How do you calculate the power of a centrifugal pump?
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
What is the software used in civil engineering?
Explain what is zoning permit?
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
How many bricks are there in 100cft?
Reinforcement details at hinged joint
Detection of a beam & a girder areββββ