Normally in slabs, steel quantity is not added when you
calculating concrete quantity for that slab, why it is not
added ?
Answer Posted / sumit
During concreting some concrete is wastage so steel quantity
is not calculated generally and no-one IS code says that
steel quantity calculated in concrete
| Is This Answer Correct ? | 13 Yes | 3 No |
Post New Answer View All Answers
give me the rate analysis for Bituminous Macadam and SDBC
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
what is flashing?
why we use 19x9x9and 20x10x10 but not other
How much cement will require for 1Rmt Skirting laying
What is the difference between absorption & adsorption and sorption?
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
What you understand by richter scale?
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
How to take labor charges for construction of 1cum of concrete?
Differentiate first angle & third angle projection?
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
Define What is made from large rocks, which protects the base of cliffs?
Technical Question of Civil Engineering