Answer Posted / prashanth
Project planning includes
1.Defination
2.Scope.
3.Budgeting.
4.Scheduling.
5.Construction phase.
6.Closeout of the project.
| Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
howto calculate the quantities of material used in fly ash brick after finding the volume??
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
rate analysis for cement pointing 1:4 , for 100 sq m
Did any of the egyptian pyramids ever fall down?
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
What is the ideal size of the living room ranges from small to large size?
Form where IS456 is adopted in 1978?
Please let me know what is the simplest way of Calculating Mix Designs
How much cement is require in one sqft area in a G+3 residential construction.
what is that one cub metre plaster in cemant and fine sand
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
Which is the direction for positive angle?
how to calculate the density for high density concrete ? or is it same as the density of RC?