Answer Posted / prashanth
Project planning includes
1.Defination
2.Scope.
3.Budgeting.
4.Scheduling.
5.Construction phase.
6.Closeout of the project.
| Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
Can we apply curing compound on ceiling (slab Bottom)
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
why does the most of civil engg is not intersted to going for teaching field?
a butt weld is specified by
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
Advantage of Aluminum form work in terms of activities can be skip and cost too
What is the different type of slump test indications?
Where will be the maximum bending moment in a TEE Beam?
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
what will be price of 1:2:4pcc per kg?
Define a polyline?
Bernaullis theorem deals with the law of conservation of mass momentum energy none
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
how to calculate the size of triangular ring in rcc column?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.