Answer Posted / nilanjan saha
When the built is prepared then it is once sent to the
client end to know their feedback over the product , their
purpose been met or not.
If the client ask for any further change then those
comes under the change requests what has to be done and
what ever the final product should have.
Abbreviation used for change request is CR.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
a proj ws atarted and cloded within the second day why?it has good amt of resources.srs ws prepers and accepted by the client too.
What is process area in cmmi?
What the purpose of testing?
How do you perform integration testing?
Define bug leakage and bug release?
Why is it often hard for management to get serious about quality assurance?
What is the difference between Outsourced Testing and Crowdsourced Testing
What Contains in Business Design Document?
kindly guide me about inspection process with the requried roles in detail?
How do you deal with environments that are hostile to quality change efforts?
Mention some of the types of software testing?
What is branch testing and what is boundary testing?
What is the role of qa in a project development?
how cani do requirement testing using some testcase
What is the difference between quality assurance (qa) and quality control (qc)?