Why would an Engineer consider combining FEEDBACK and
FEEDFORWARD control in some applications?
Answer Posted / r.murugan
Feed forward control required three inputs like drum level
control (steam flow,drum level,feedwater flow
closed loop control with feedback only applicable
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How to find out the current of two motors having same power consumption but different RPM?
How is automatic reference junction compensation carried out in temperature recorders?
plz send me general of ongc
i have steam drum height 1000mm. and i want to placed the transmitter below the tap.how i calculate.
while i check zero check for dp flow transmitter some fluctuating came (0 to 458 kg/h) what is the reason?
Instrumentation Safe Guarding test. How to determine the interval time of the test. eg:Halfyearly,Every year,Every three years etc.
we are using centum vp as monitoring with Dell precision work station T3600 but some times PC(s) are restarted automatically . how we can solve this problem? thanks
i have been asked by QAFCO to appear for interview for thy post of Instrument Designer(INTOOLS)..i m engineering graduate with 5 years exp. in design engineering.Will this job profile suit me??i need all ur help n suggestions for thy same?
typical loop drawing of a simple feedback control comprising of one transmitter and one control
How to calibration coriolis flow meter?
What is the principle of capacitance type level transmitter?
why fuse block is not used for AI signal?
How can i copy program (parameter) from mm440 (V.F.D.) by using BOP?
Exothermic reaction./ endothermic reaction
Displace type LT to be calibrated in workshop, wt. 40, dia- 60 mm, density- 0.8kg/cm3.