Answer Posted / dhananjai d.k
Ascarel oil...........
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
How Load Factor, Demand Factor, Diversity Factor etc best applied in designing an electrical circuit? Is it allowed to consider these factors in each and every panel in an electrical distribution system? Can any body suggest a good book for reference?
What is the instrument to check the rotating diode fuse of alternator in running conditions?
what are the types of electromagnetic forces developed in practical transformer?
Hello seniors m an engineering student in 3rd yr..i want to know what are the software course in electrical field?i wanted to do certification course but i dont know much about the course?..Regards
there are cam operated switches - why we call cam operated , What is cam ?
An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.
What is the suitable transmission voltage?
bitumar
Why computer humming sound occurred in ht transmission line?
HOW TO CALCULATE HV CABLE SIZING?
How to calculate VCB rating for 33KV ,25 MW Power line?
What is the need of earthing transformer for delta side of a transformer. (Think of a line section between a star/delta transformer at a grid substation and delta/star transformer at a village. An earthing transformer is there at the delta side of the star/delta transformer at grid substation). As there are no ground reference there will not be fault current if a one phase is grounded. Further L-L phase will be sensed by the primary side of star/delta transformer as a L-G fault. So why an earthing transformer is required at delta side
What are the Formula of computing Back up Time of 500kVA UPS with 4 Battery Banks, each bank composed of 43 pcs of Batteries 12V150Ah. How to compute the Back up Time of UPS? We have also 3X500kVA UPS running in Parallel same composition as I write above.
design a 3 bit synchronous and asynchronous counter using T- flipflop
Which type of questions well asked. ?