can any body tell me that we stdy different grades of
concrete $ their strength . as we knot the strength of
conrete that this grade or ratio of concrete has this much
strength ? even that we go for labortory test what is
reason behind that?
Answer Posted / sathish
eventhough we did everything correctly in the mix design
there may be a deviation from our manual calculation to the
field hence we need different samples for the cube testing
and the average values of the different samples serves as
the evidence of our work.the deviation value which i said
will occur due to several reasons such as improper mixing,
water content, properties of cement, sand and aggregate and
even due to properties of water.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
VAT and CST ? Which benefits for buyer ? Why benefits?
pls tell me , what is the water content
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
In a concrete grade C35A, C & A stands for what and equalent cube strength?
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
what is the use of water bar in water tank and is this an extra item in estimate?
How did the romans get water up hills using aqua ducts?
in design case of structural member best suitrable percentage of steel limit is what
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
why is M30 grade Concrete use for Foothing & Column M50