A bill was raised by contractor which read as follows
1.) Excavation in normal soil upto 1.5m - 250 cum
2.) Excavation in normal soil 1.5m to 3m - 240 cum
3.) Excavation in soft rock - 350 cum
4.) Excavation in hard rock - 250 cum
5.) Filling with available soil - 825 cum
6.) Filling with bought out soil - 1100 cum
How can I verify the above quantities, especially for item
no. 5 & 6?
What checks are necessary before releasing the bill ?
Answer Posted / u.arunkarthick
here the total excavation qty is 1090 m3, then minus the qty
of concrete used for footing and add consolidation of soil
as 2 to 3%, example if we excavate 1m*1m*1m = 1m3 of
excavated earth is there, then refill that area needs 1.2m3
because of soil consolidation.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
The largest size of paper used in plotter to print the drawing made by Autocad .
How much cement will require for 1Rmt Skirting laying
what is flexible and rigid footing?
how u design STAGING for Superstructure in BRIDGE construction?
how will remove spiderweb cracking in plaster ? what the reasone of make it ?
Define What is a kip?
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
What is construction mitigation management?
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
What is the cemnent ratio
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
is basic cost of the material includes tax?
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
Civil engineering material testing Standard results
what is grade intersection?