Answer Posted / anuj gulia
it is a sedimentary material whose size varies in between
clay and sand
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
types of survey and levelling instrument ?
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
What is need for setting limits?
how to create our resume?
What is the release of lien?
What is the difference between built area and super built up area?
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
Volume of 25kg putty bag & 40 kg putty bag volume??
why +1 to be followed for calculating the no of bars in BBS. Please explain
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
Who name us Engineer & Why?
how much cement sand n bricks required in im3?and how much in plaster?
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.