what is unit of
inductance
Answer Posted / prajakta rode
henry
| Is This Answer Correct ? | 10 Yes | 1 No |
Post New Answer View All Answers
how to caculate cable size for diff types of loads? if anyone know the calculating procedure please tell me
How can you sized or estimate the ligthning arrester current rating?
How to perform a DC resistance test In Alternator and their proceduces?
What is the necessary condition for stability.
what is the difference between changer, converter and transformer?
how we arrange the hv side with delta connection in case 33/11kv of transformer.
whats the differece between Exd and Exe
what is the minimum recommended leakage current of an earthed cable connected to the body or skid of an alternator
Give two basic speed control scheme of dc shunt motor?
Sir,In our company there are 3 caterpillar make(capacity:(1) 3.3KV,2.5MW(2)3.3KV,2.5MW & (3)3.3KV,1.9MW) & 1 deutz make (capacity:11KV,3.8MW)gas engines utilised,all are running in paralell. There are three transformer utilised,(1) 6.25MVA,3.3KV/22KV,Impedence voltage:6.7% used for two generator,both are 2.5MW(2)5.5MVA,3.3KV/22KV,Impedence voltage:7.2% used for one generator of 2.5MW & (3) 5.5MVA,11KV/22KV,Impedence voltage:7.8% used for one generator of 2.5MW.all generator breakers capacity of 1250Amps. Sir,I want the details of fault level calculation of generator,transformer individually & for whole system. If you require any information from me.feel free for contact me sir.pl.send the answer of my question as the earliest as possible.
I want to know all basics of electrical engineering
What should be the Sandwitch type Al. bus bar capacity for 2 M.W.Gen. set, having continuous full load current- 3463 Amps,ambient temp.- 50 Deg. C., Required temp. raise-20 deg.C., it will run 24 hrs, 365 days on full load, required highly reliable.
what is the difference between Central Battery System and UPS in applications and uses? and why UPS suitable for Computers and central battery for emergency lighting?
If not into production, how far did you follow the design and why did not you see it into production?
what is the difference between rectifier and converter and commudator?