What is the proportion of cement agg. and sand for M20,M25
and M30?
Answer Posted / sobhanbabu
M5,M7.5,M10,M15,M20 -nominal mixes(by wt or by volume)
M25-both nominal and design mix
M30,M35,M40-design mixes(mixes designed specially in lab)
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
What is the effect of a building collapse?
Explain different types of rcc pipes.
how much percent are used 20mm,10mm?
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
What are the different theories of failure under static load?
Explain major difference between auto level and dumpy level?
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
Why was the empire state building made of steel?
Are cruise ships built for the transatlantic run?
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever