Answer Posted / sobhanbabu
the sand which is having more permiability and low bearing
capacity is called quick sand.
ex:crusher dust and river sand near the starting of river.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Why you are leaving present job?
what is moment-curvature relationship in semi rigid connections??
Which are the top apps for you civil engineering?
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
How to calculate construction cost of residential building in mumbai
what course did you consider thinking before you enrolled in college?
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
Define What is an ice dam sock?
What Are The Steps Involved In The Concreting Process, Explain?
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
What are the different types of foundation?