Answer Posted / sobhan
4%of bd
| Is This Answer Correct ? | 2 Yes | 13 No |
Post New Answer View All Answers
Pls explain me about tension and compression in a flat slab
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
how much cement and sand required for 100sqm of wall plastering in different proportions
What is the basic difference between OPC
What is rate of concrete surface rendering work per sqm
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
Define What is the distance between railway tracks?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
what is pqc
Please tell me vasthu room sizes. Thanks.
what is the calculation of raw material for 0.35cum of m-15
What is bmc stands for in bmc software?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
how to caluclate sienerge qty in construction in ap