Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

hi everybody. right now i am working with thermal power
plant. our company plant is tripped because of program
corrupt. i would like to know is it possible when the plant
is running. we are using FREELANCE ABB800F CONTROLLER.

Answer Posted / jayesh patel

hi i have exprience in petrochemical and power plants
severly in dcs system there is no chance to have failure of
program because in dcs system ther will be two system one
will be master and another will be slave the running system
will be observed by master processor and if master
processor will currupt it will shows alarm to the system
and in same time slave system come in action due to failure
of master processor and in that curcumstrances we have to
check the master processor why it was fail then if the
problem is solve then can take master processor online
manualy and check its output as same as slave processer and
if found ok then we can take in auto mode

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i want to know the interview format fot gail, instrumentation. pls answer me in habib.sami1003@gmail.com

3164


how the arrangement of equipments done in control room

2001


Why ac supply load cell is used? Can we use the dc supply load cell?

1064


I WANT SECURITY PAPER MILL, HOSHANGABAD TEST PAPER.KINDLY SEND TO MY MAIL ID

2787


how do we commission inergen system?

1945


Why even multiple power supplu r used in instrumentation system?

4970


WHAT IS MEANT BY PROJECT MANAGEMENT STRATEGIES IN INSTRUMENTATION?

3531


define feed forward control loop with example and drawing?

3202


Decibel.

2539


What is the purpose of LO Overhead tank in turbines.

1996


Explain the key components of control loop?

1050


ORP sensor working principle?

2002


Tell me the field calibration procedure step by step with diagram of pressure gauge, pressure switch, pressure transmitter, temperature switch, level switch, flow switch, flow transmitter.

3204


how to commission furnace ( water heater)

2040


How u measure the massflow in orifice flow measurement techniques

1404