How to defind P.C.C. mix design according ratio & IS coad
Answer Posted / hariprasath
1:2:4
Is This Answer Correct ? | 17 Yes | 7 No |
Post New Answer View All Answers
How much for the BRC lapping in full yield and half yield < and which table to get it ?
Coverage of 25mm.thick ratio of 1:4 cement mortar?
What Are The Different Type Of Slump Test Indications?
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
What do we mean by partial moment release ??
Define What happens to Load at yielding ?
What are the main reasons for conducting pull-out tests for soil nails?
What are the RISKS during the project construction?
What is the difference between EPC,DBOOT and BOOT.
what is pile and deam foundation
how lap length is increased with increase of Grade of steel?
can stub column take the load as main column
what is shuttering co efficient?
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38