Answer Posted / santosh
ESTIMATING AND COSTING BY B.N.DUTTA ,OR CHAKRABORTY ARE
BEST BOOKS
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
Why should pumping be not used in case of concreting works?
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
What is the Unit weight of coarse sand (F.M- 2.20) ?????
How much cement and water required for cement selery????
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
How will be cutting in timber plate size 600*400 column size
What is Curtailing of R/F
In the roof of a pumping station explain briefly the components of a waterproofing system?
What is kn measurement?
what are the types of dimensioning?
How to calculate plastering for elevated water storage tank
What is oneside mat. And explain