Quick setting cement's setting time?
Answer Posted / manikanta73
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How much of the strength of concrete comes from post- production curing?
What are the applications of modulus of elasticity?
define the strength
How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
List out some of the software program that can be useful for architect?
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
PL.tell me about civil engineering questions with answer
how to estimate material requirement for an area of house in square feet?
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
from where ican get sample papers for CET-delhi 2012
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
Write short note on construction programme for pile foundation.