Answer Posted / manikanta73
20N/mm2
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
i want texture painting pwd data
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
What are the steps involved in the concreting process?
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
How to determine spacing of bars in slabs or beams
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
How do we calculate absolute pressure?
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
how we calculate the grade of the Bituminous materials.?????
how much required strength of cement concrete bricks(size 230x115x75mm)
what are the changes in concrete pour height as per IS 456, 2009?